6.6 C
Fort St. John
Monday, November 19, 2018
Tel: 250-787-7100
Email: contact@energeticcity.ca
9924 101 ave Fort St. John, B.C.
Advertisement
Advertisement
Advertisement

Peace River nuclear site on temp. hold

Plans for a nuclear powerplant in the Alberta Peace have been put on hold.
The Edmonton Journal is reporting that the company behind the plan, Bruce Power, has temporarily withdrawn its application for the plant, citing concerns about an aquifer near the first site, which was to be located on the northeast shore of Lac Cardinal, about 30 kilometres west of Peace River.
The Ontario-based company is now reportedly looking into a second site, about 30 kilometres north of town.
Bruce Power says it will complete its site evaluation, and announce its preferred site sometime in early 2009.

Advertisement
Advertisement
Advertisement
Advertisement

Warning: array_merge(): Argument #2 is not an array in /home/energet6/public_html/wp-includes/widgets/class-wp-widget-custom-html.php on line 127

Warning: array_merge(): Argument #1 is not an array in /home/energet6/public_html/wp-includes/widgets/class-wp-widget-custom-html.php on line 134

Local Events

Doc Walker to play the Lido Theatre

HYPNOTIST: RAY ANDERSON

Jokes N Tokes Comedy Tour

Advertisement
Advertisement
Advertisement

Must Read

Call for Facebook CEO to testify at International Grand Committee continues...

OTTAWA - Bob Zimmer has once again added his name to the growing list of elected representatives worldwide calling on Facebook CEO Mark Zuckerberg to...

Trackers win over Storm 3-2