4.4 C
Fort St. John
Tuesday, November 20, 2018
Tel: 250-787-7100
Email: contact@energeticcity.ca
9924 101 ave Fort St. John, B.C.
Advertisement
Advertisement
Advertisement

Input sought on BG Canada’s Prince Rupert LNG project

It would be developed in two phases, with a capacity of up to 21 million tonnes a year when all three trains are operational. The project has been proposed by BG Group Canada, with Spectra Energy selected to build the accompanying 850 kilometre pipeline from near Fort St. John.

If it is determined that a federal environmental assessment is required, there will be three more opportunities for the public to comment on the project. Written comments must be submitted by May 27, 2013 to:

Prince Rupert LNG Project
Canadian Environmental Assessment Agency
410-701 West Georgia Street
Vancouver, BC V7Y 1C6
Telephone: 604-666-2431
Fax: 604-666-6990
PrinceRupertLNG@ceaa-acee.gc.ca

Advertisement
Erica Fisher

Erica is a reporter for Moose FM and energeticcity.ca in Fort St. John, B.C. She grew up in Victoria, B.C. and received her Bachelor's Degree in Journalism from Concordia University in Montreal, Quebec.

Advertisement
Advertisement
Advertisement

Warning: array_merge(): Argument #2 is not an array in /home/energet6/public_html/wp-includes/widgets/class-wp-widget-custom-html.php on line 127

Warning: array_merge(): Argument #1 is not an array in /home/energet6/public_html/wp-includes/widgets/class-wp-widget-custom-html.php on line 134

Local Events

Doc Walker to play the Lido Theatre

HYPNOTIST: RAY ANDERSON

Jokes N Tokes Comedy Tour

Advertisement
Advertisement
Advertisement

Must Read

Trans Mountain Hearing

CALGARY, A.B. - A rooftop smudging ceremony where herbs were burned and prayers said served as a proxy for swearing in as the oral traditional...

City hosts Festival Design workshop